Official Case Study & Handover Report: Detailed architectural design, BNBC 2020 structural compliance, BoQ materials breakdown, and turnkey execution metrics.
LocationBanani Block D, Dhaka, Bangladesh
Area Transformed310 m²
Execution Time2 Working Days
Year Completed2025
Visual Transformation Comparison
Drag the interactive slider to view the space before renovation versus the completed Aesthetik architectural finish.
AFTER • Aesthetik Transformation
BEFORE • Original Surface
Drag or swipe to compare
Client Brief
The Vision & Functional Requirements
Strict building management rules in Banani Block D, Dhaka, Bangladesh mandated a maximum 50dB footfall impact sound transmission and dust-free cutting on balconies only.
Engineering Solutions
Subfloor Precision & Execution Challenges
We deployed 1.5mm acoustic IXPE decoupling pads alongside French Chevron engineered timber, surpassing building sound compliance requirements while completing the installation in 48 hours.
Project Image Archive
Materials Specified
French Oak Chevron Engineered Wood 15mm
Calacatta Gold LVT Luxury Tiles
Flush Aluminum Baseboards
Have a similar property in Banani Block D? Request an identical finish sample box.
Book Free Site Survey